PENJADWALAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE CPM (Critical Path Method) DAN PERT (Project Evaluation and Review) (Studi Kasus Pembangunan Poskesdes Ds Trate Kec Sugihwaras Bojonegoro)

15062022, AFFIB MUKAROM, S.T. (2019) PENJADWALAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE CPM (Critical Path Method) DAN PERT (Project Evaluation and Review) (Studi Kasus Pembangunan Poskesdes Ds Trate Kec Sugihwaras Bojonegoro). Skripsi thesis, Universitas Islam Darul Ulum Lamongan.

[img] Text
15062022_PENJADWALAN PROYEK KONSTRUKSI DENGAN MENGGUNAKAN METODE CPM (Critical Path Method) DAN PERT (Project Evaluation and Review) (Studi Kasus Pembangunan Poskesdes Ds Trate Kec Sugihwaras Bojonegoro).pdf

Download (85kB)
Item Type: Name Thesis (Skripsi)
Subjects: A General Works > AI Indexes (General)
L Education > L Education (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: admin unisda jaya
Date Deposited: 21 Nov 2019 04:37
Last Modified: 21 Nov 2019 04:37
URI: http://repository.unisda.ac.id/id/eprint/353

Actions (login required)

View Item View Item